The height of the installation for the shower is clearly defined in the industry. Which are mainly divided into the shower and the installation of the shower. With the relevant provisions of the installation of the shower shower installation height is the wall buried underground outlet center should be 2.1 meters from the ground, shower switch center from the ground is best for the 1.1 meters; and the shower is generally sprinkled out of the water for the definition , The height of the shower installation is preferably 2 meters from the ground. Such a shower installation height is generally prescribed, if necessary, according to their own wishes.
Shower Set Installation real shot process
1. All the main parts and Accessories
2. The water valve should be closed first, then the reserved flow-water mains will be shut down.
3. Turn the interface to wrap the raw material belt, to be more entangled, avoid to install the water leak.
4. Install the rotary interface on both sides of the outlet.
5. The two sides of the interface should be symmetrical, and then the water mixing valve will be placed on a ratio.
6. Install the decorative cover of the interface and the rubber pad.
7. Install Shower Mixer and Faucet
8. Screw with a wrench, and remember to use a cloth bag, or it will scrape the Chrome plating.
9. Install Shower Sliding Bar
10. The Sliding bar is fixed and use a pen to mark first.
11.The electric drill, 6mm bit, can knock a little hole first, so that it won't be biased.
12. Fix the holder
13. Fix the Sliding Bar
14. Install Rain Shower
15.Install Shower Hose
16. Completed